ÚTEF - Ústav technické a experimentální fyziky ČVUT - České vysoké učení technické v Praze
Česky English
ÚTEF - Ústav technické a experimentální fyziky ČVUT - České vysoké učení technické v Praze
ČVUT - České vysoké učení technické v Praze
Publikace  > 'The ATLAS semiconductor tracker end-cap module'
The ATLAS semiconductor tracker end-cap module

Autor

Rok
2007

Časopis
NIM A 575 (2007) 353–389

Web


Obsah
The challenges for the tracking detector systems at the LHC are unprecedented in terms of the number of channels, the required readout speed and the expected radiation levels. The ATLAS Semiconductor Tracker (SCT) end-caps have a total of about 3 million electronics channels each reading out every 25 ns into its own on-chip 3.3 micros buffer. The highest anticipated dose after 10 years operation is 1.4 x 10^14 cm^-2 in units of 1MeV neutron equivalent (assuming the damage factors scale with the non-ionising energy loss). The forward tracker has 1976 double-sided modules, mostly of area ~70cm^2, each having 2 x 768 strips read out by six ASICs per side. The requirement to achieve an average perpendicular radiation length of 1.5% X_0, while coping with up to 7W dissipation per module (after irradiation), leads to stringent constraints on the thermal design. The additional requirement of 1500e equivalent noise charge (ENC) rising to only 1800e ENC after irradiation, provides stringent design constraints on both the high-density Cu/Polyimide flex read-out circuit and the ABCD3TA read-out ASICs. Finally, the accuracy of module assembly must not compromise the 16 microm (rfi) resolution perpendicular to the strip directions or 580 microm radial resolution coming from the 40 mrad front-back stereo angle.

A total of 2210 modules were built to the tight tolerances and specifications required for the SCT. This was 234 more than the 1976 required and represents a yield of 93%. The component flow was at times tight, but the module production rate of 40–50 per week was maintained despite this. The distributed production was not found to be a major logistical problem and it allowed additional flexibility to take advantage of where the effort was available, including any spare capacity, for building the end-cap modules. The collaboration that produced the ATLAS SCT end-cap modules kept in close contact at all times so that the effects of shortages or stoppages at different sites could be rapidly resolved.
Granty

Projekty


Příklad citace článku:
A. Abdesselam, P. Beneš, T. Horažďovský, Z. Kohout, V. Král, V. Linhart, S. Pospíšil, V. Sopko, B. Sopko, M. Solar, P. Čermák, . et al., "The ATLAS semiconductor tracker end-cap module", NIM A 575 (2007) 353–389 (2007)

Hledat
Události

IEEE NSS/MIC/RTSD
Seoul
27 Oct - 2 Nov 2013

15thIWORID
Paris
23-27 June 2013

NSS MIC IEEE Conference
Anaheim, USA
29 Oct - 3 Nov 2012

Int. Workshop on Radiation Imaging Detectors
1-5 July 2012

Program oslav 10. výročí založení ÚTEF
4-6. 6. 2012

Pozice pro mladé výzkumné pracovníky

Příležitostní razítko k 10. výročí ÚTEF
Na Hrádku 2, Praha 2
30.4, 2-4.5 2012

Collaboration Meeting NEMO/SuperNEMO
Prague, Czech Republic
27.2.-1.3. 2012

Vzpomínkové setkání k připomenutí životní cesty RNDr. Františka Lehara, DrSc.
Refektář Benediktinského opatství v Emauzích, Praha 2
8. února 2012

Zemřel František Lehar
Lyon, Francie
23.11.2011

Vše...
10th Anniversary of IEAP